Name a move coordinator and separate contacts for facilities, IT and team departments. Build an asset list that distinguishes company equipment, leased items and personal belongings. Confirm which equipment the removal team handles and which items require the supplier or IT team.
Assign an owner to each workstream
Make delivery labels usable
Give each destination desk, room or storage zone a unique code and use the same code on boxes and the floor plan. Keep cables and peripherals linked to their workstation. Arrange controlled handling for confidential documents under your organisation’s procedures. Confirm lifts, loading bays and authorised access at both premises.
Pro Tip from Our Team
Start planning your move at least 6 weeks in advance. The earlier you book professional removal services, the better rates and availability you'll secure — especially during peak moving season (May–September).
Accept the move in stages
Check delivered furniture and assets against the list before teams unpack. IT staff should verify connectivity, printers and the agreed business systems before normal work resumes. Record missing items or unresolved setup tasks with an owner. For the earlier schedule and downtime decisions, read the office move planning guide.
5,000+
Moves Completed
4.9★
Google Rating
100%
Fully Insured
Frequently Asked Questions
QWho should disconnect office IT equipment?
Agree this with your IT team or equipment provider. Do not assume disconnection, backups or network setup are included in a removals booking.